Quartet®

Quartet Prestige 2 Total Erase Project Planning Board, 48 x 36, Graphite Frame (QRTPP43P2)

Quartet Prestige 2 Total Erase Project Planning Board, 48 x 36, Graphite Frame (QRTPP43P2)

Regular price $379.51
Sale price $379.51 Regular price
/ Each
Sale Sold out

Out of stock

Product Specification

  • Case Pack: Each
  • Color: Graphite
  • Board Height: 36"
  • Board Type: Magnetic Dry Erase Calendar
  • Board Width: 48"
  • Frame Color: Graphite
  • Frame Material: Fiberboard/Plastic
  • Mounting Details: Pass-through
  • Post-Consumer Recycled Content Percent: 0%
  • Pre-Consumer Recycled Content Percent: 0%
  • Surface Color: White
  • Surface Material: Magnetic Total Erase®
  • Total Recycled Content Percent: 0%
  • Global Product Type: Boards-Magnetic Wet/Dry Erase
  • Grid Columns: 40
  • Grid Rows: 25
Managing multiple schedules is easier with a Prestige 2 project planner. This magnetic project planner lets you display multiple schedules all in one place and make changes on the fly with ease. The coated Total Erase surface is extremely durable, easy to clean and will not ghost or stain. Printed chart features customizable headers for personalized organization and clear segmentation of data to monitor any key information on the 28 rows and 42 columns. Magnetic quality lets you use colored magnets to mark your project status. Metal frame and marker tray are specially designed to securely hold all Quartet Prestige Connects accessories (sold separately) so you optimize your work space. Project planner also includes easy mounting hardware for fast, accurate wall hanging and one dry-erase marker with a chisel tip.
General Information
Manufacturer:ACCO Brands Corporation
Manufacturer Part Number:PP43P2
Manufacturer Website Address:http://www.acco.com
Brand Name:Quartet
Product Line:DuraMax
Product Name:Prestige 2 Total Erase Chart Planner Board
Marketing Information:Managing multiple schedules is easier with a Prestige 2 project planner. This magnetic project planner lets you display multiple schedules all in one place and make changes on the fly with ease. The coated Total Erase surface is extremely durable, easy to clean and will not ghost or stain. Printed chart features customizable headers for personalized organization and clear segmentation of data to monitor any key information on the 28 rows and 42 columns. Magnetic quality lets you use colored magnets to mark your project status. Metal frame and marker tray are specially designed to securely hold all Quartet Prestige Connects accessories (sold separately) so you optimize your work space. Project planner also includes easy mounting hardware for fast, accurate wall hanging and one dry-erase marker with a chisel tip.


Packaged Quantity:1 Each
Product Type:Planner

Product Information
Features:
  • Durable
  • Stain Resistant
  • Magnetic
  • Ghost Resistant
  • Marker Tray
  • Mountable

Physical Characteristics
Product Color:
  • White
  • Graphite

Height:36"
Width:48"
Miscellaneous
Package Contents:
  • Prestige 2 Magnetic Total Erase Project Planner
  • Marker Tray
  • Mounting Hardware
  • 1 x Quartet Chisel-tip dry-erase Marker

Recycled:No
Assembly Required:No
Country of Origin:United States
TAA Compliant:Yes
Warranty
Limited Warranty:20 Year
View full details